As Long Beach State Athletics tackles the leaks and repairs needed for the Walter Pyramid, past repair estimates and damage could bring it down.
Tag: Mark Zakhour
How prepared is Long Beach State for future heat waves?
Although the university is working toward campus sustainability, Long Beach State infrastructure struggles to hold up against record-setting temperatures.
CSULB’s new alumni center to be completed by 2022
Previously, the alumni center was scheduled to begin construction in 2018, but due to complications, like the recent earthquakes, it was pushed back to fall 2020.
CSULB buildings PH-1, FO-4 and FO-5 to be demolished and replaced
In place of the old buildings, a new structure will be built to house the College of Health and Human Services.
Improving physical accessibility: an ongoing process at CSULB
Stairs make up a lot of the campus, which makes getting used to a new campus difficult for students that can’t use them. Facilities makes sure that there is a way, however.
Student Success Center opens doors to students, staff and faculty
Students, staff and faculty can now enter the new Student Success Center located in the exterior quad between the Molecular Science building and Peterson Hall 1. The building is a renovation of the former Peterson Hall 2 and provides new academic labs, studio spaces and student lounges. The Daily 49er[Read More…]
Long Beach State builds new CCPE building that uses renewable energy
Long Beach State is home to the first net-zero energy structure in the Cal State University system following the completion of the College of Continuing and Professional Education building, according to Director of Design and Construction Services Mark Zakhour. The $32 million project, which has the capability of reducing energy[Read More…]
University Library lower level temporarily shut down after water leak
Students trying to catch a study break in the University Library’s lower level will be greeted by locked double doors with a sign taped to them stating that the entire floor except for the Disabled Students Study Room is closed. Those who don’t have access to room 13, the Disabled[Read More…]